Anzan Pouya Engineering Company

Anzan Pouya Engineering and Technical Company
Anzan Pouya Engineering and Technical Company was established in 2003. This company, with its specialized and modern machinery within the framework of a management system, is striving to implement projects in accordance with current world standards, with the approach of reducing project completion time as its main focus, in order to play a lasting role in the prosperity and pride of our beloved country of Iran.
 
 
Implemented projects:
  • Mahshahr-Shadegan pipeline construction project
  • Client: Iran Water and Gas Engineering and Development
  • Line length: 35.5 km
  • Pipeline size: 24 inches
  • Status: Temporary delivery
  • Key activities: Carrying out the project in the swampy and estuary route, performing mechanical operations below the groundwater level

 

Makran, Chabahar and Konarak gas transmission pipeline
  • Client: Iran Water and Gas Engineering and Development Company
  • Line length: 110 km
  • Pipeline size: 16, 20, 30 and 42 inches
  • Status: Under construction
  • Key activities: Limited access routes, construction of 15 km adjacent to the Persian Gulf and mountainous nature of the route

 

Palizan-Pskoh, Pskoh-Soran and Pskoh-Zabli gas transmission pipelines
  • Client: Iran Water and Gas Engineering and Development Company
  • Line length: 153 km
  • Pipeline size: 16, 12 and 16 inches
  • Status: Under implementation
  • Key activities: Accelerate implementation and early commissioning

 

 
Iranian Butia Steel Gas Transmission Line
  • Employer: Iranian Butia Steel
  • Line length: 43 km
  • Pipeline size: 20 and 30 inches
  • Status: Permanent delivery
  • Key activities: Passive defense limitation

 

 
Mahan-Bam gas transmission line (second section)
  • Employer: Kerman Province Gas Company
  • Line length: 82 km
  • Pipeline size: 16 inches
  • Status: Permanent delivery
  • Key activities: Supply of 40 km of sheets and pipes under sanction conditions during the initial contract period

 

 
Rashtkhar gas transmission line to Sangan Steel Complex
  • Employer: Shargh Infrastructure Company
  • Line length: 90 km
  • Pipeline size: 16 inches
  • Status: Permanent delivery
  • Key activities: Priority gas supply to the country's industries

 

 
Bandar Lengeh Pipeline
  • Employer: Hormozgan Province Gas Company
  • Line Length: 70 km
  • Pipeline Size: 20 inches
  • Status: In progress
  • Key Activities: Specific Climatic and Regional Conditions