Board members

Name: Haji Mohammad Taklozadeh

Position :

Chairman of the board

Experiences :

  • Member of education board, Academic Center for Education, Culture and Research, Tabriz university, from 1982 to 1983
  • Officer, agriculture committee of Jihad of Construction, from 1983 to 1991
  • General director, Administration Department of Natural Resources and Watershed of Kerman province, from 1991 to 1994
  • Faculty member of plant pathology department, agriculture faculty, Shahid Bahonar University of Kerman from 1994 till now
  • Chairman of gardening research center, Shahid Bahonar University of Kerman, from 1994 to 1999
  • General director of office affairs, Shahid Bahonar University of Kerman, from 1995 to 1997/li>
  • Deputy of urban service, Kerman municipality, from 2003 to 2005
  • Chairman of agriculture organization from 2005 to 2010
  • Deputy of human resource development and management, government office of Kerman province, from 2010
  • Planning deputy, government office of Kerman province, from 2010
pic

Name: Hasan Hasanzadeh

Position :

Chief executive officer

Experiences :

  • Instructor of electrical department, Technical & Vocational Training Organization
  • Electrical repair specialist of melt and rolling mills, Hezar Aluminum Industrial Co., from 2003 to 2005
  • Chairman of electrical energy management, Hezar Aluminum Industrial Co., from 2005 to 2009
  • Site superintendent of Radniroo Co. in installation and commissioning of power distribution substations and bus duct connections of Almahdi Aluminum Co., 2009
  • Electrical supervisor, overhaul of seven gas units in Kerman combined-cycle power plant, 2009
  • Electrical supervisor, overhaul of G16 gas turbine (V94.2 gas unit) in Chabahar combined-cycle power plant, 2010
  • Electrical supervisor, overhaul of GT11 gas turbine (V94.2) in West Azarbaijan combined-cycle power plant, 2010
  • Transformer repair shop supervisor, from 2010 to 2011
  • Project manager, construction of electricity transmission lines for valve and pressure reduction stations in Mahshahr related to 56-inch gas pipeline of sixth phase, 2011
  • Project manager, draining and pumping water to bottom of mines 1 and 3 of Gol Gohar Sirjan, from 2012 to 2013
  • Project manager, 16-inch gas transportation pipeline for Sirjan Iranian Steel Co. (Bardsir) with a length of 10 kilometers, 2013 and 2014
  • Project manager, gas feed line of length 1400 m for Sirjan Steel World Co., 2014
  • Project manager, 36in-diameter Iranshahr-Zahedan gas transportation pipeline, from 2014
  • Project manager, 56in-diameter Dehgolan-Mindoab gas transportation pipeline, 2017
  • Project manager, 42in-diameter Gureh-Jask crude oil pipeline (Part III) of a total length 157 km in an EPC project
  • Project manager, material procurement and execution of 36in-diameter gas pipeline, southern Mashhad
  • Project manager, 42in-diameter Rasht-Chelavand gas transportation pipeline (Part II) in a PC project
pic

Name: Mohammad Hossein Fazlali

Position :

Board member, technical and support manager and power plant project manager

Experiences :

  • Turbine specialist, Iran Power Plant Repairs Co., overhaul of three gas turbines of ALSTOM units in Persian Gulf power plant
  • Turbo-compressor Mechanics specialist, overhaul of V94.2 gas unit, Kerman combined-cycle power plant, 2009
  • Turbo-compressor specialist, ANSALDO Co., Upgrading GT16 gas turbine, Kerman power plant, 2010
  • Turbo-compressor supervisor, overhaul of GT11 gas turbine (V94.2 gas unit), West Azarbaijan combined cycle power plant, 2010
  • Turbo-compressor supervisor, overhaul of G16 gas turbine (V94.2 gas unit), Chabahar combined-cycle power plant, 2010
  • Site superintendent, fundamental repairs of gas unit 1, Jahrom power plant, 2010
  • Mechanical supervisor, upgrading of spare rotor of Gilan combined-cycle power plant in corporation with ANDALDO (Italy), 2011
  • Site superintendent, 25000h visit from S3 steam unit of Damavand combined-cycle power platn, 2014
  • Project manager, hot line of gas unit 2 in Shahid Kaveh combined-cycle power plant, 2014
  • Project manager, construction of a water well and transportation line to pond of Kerman combined-cycle power plant, 2014
  • Site superintendent, supervision on 100000h repairs and maintenance and LTE of gas units 6 and 8 in Kerman combined-cycle power plant, 2015
  • Project manager, gas distribution network of rural areas around Fahraj county, Bam, 2017 Name: Mohammad Jalili Hasani Kheradmand
pic

Name: Jafar Altayeb

Position :

Board member

Experiences :

  • -------
pic

Abdolreza Tavvakoli

Position :

Board member and CEO of Radniroo electricity meter manufacturing factory

Experiences :

  • Instrumentation specialist, installation of four steam units in Kerman combined-cycle power plant, Nasb Niroo company, 2008
  • Instrumentation specialist, fundamental repairs of V94.2 gas units No. 1, 2, 3, and 4 in Kerman combined-cycle power plant, Radniroo Co., from 2009 to 2010
  • Instrumentation specialist, fundamental repairs of V94.2 gas units No. 5, 6, and 8 in Kerman combined-cycle power plant, Radniroo Co., 2010
  • Instrumentation supervisor, fundamental repairs of V94.2 gas unit No. 1 in Urmia power plant, Radniroo Co., from 2010 to 2011
  • Instrumentation supervisor, fundamental repairs of V94.2 gas units No. 2 in Jahrom combined-cycle power plant, Radniroo Co., 2011
  • Instrumentation supervisor, fundamental repairs of V94.2 gas units No. 1 in Shirvan combined-cycle power plant, Radniroo Co., 2011
  • Instrumentation supervisor, fundamental repairs of V94.2 gas unit No. 2 in Chabahar combined-cycle power plant, Radniroo Co., from 2011 to 2012
  • Instrumentation supervisor, fundamental repairs of MW701 Mitsubishi gas unit No. 1 in Kazerun combined-cycle power plant, Radniroo Co., 2012
  • Officer of distribution grids, Radniroo Co., from 2012 to 2016
  • Project control specialist, construction of 16in-diameter gas transportation pipeline, Sirjan Iranian Steel Co. (Bardsir), Radniroo Co., from 2013 to 2014
  • Instrumentation supervisor, 100 hours of repair and maintenance and LTE of gas units 6 and 8 in Kerman combined-cycle power plant, from 2015 to 2016
  • Project manager, construction of electrical utilities, distribution grids, substations, and lightning of passages in Kulaghan shrimp farm, Hormozgan, from 2016 to 2017
  • Project manager, electricity supply and lightening for passages in the mines 1 and 3 of Gol Gohar Sirjan
  • Electrical department director, Radniroo Co., from 2017 till now
  • Project manager, construction of the double-circuit power transmission line from Ravar Super-distribution substation to Ravar Steel Co. with a total length of 35 km, from 2019
  • CEO of electricity meter manufacturing plant from 2019
pic